Skip to product information
1 of 7

128GB M.2 2242 SATA III Internal Solid State Drive (SSD) EVM (2-Cut) – 520MB/s Read | 400MB/s Write | 3D NAND | Ultra-Compact Storage

128GB M.2 2242 SATA III Internal Solid State Drive (SSD) EVM (2-Cut) – 520MB/s Read | 400MB/s Write | 3D NAND | Ultra-Compact Storage

Regular price Rs. 1,349.00
Regular price Sale price Rs. 1,349.00
Sale Sold out
Shipping calculated at checkout.
Specification Details
Brand EVM
Model Name M.2 2242 SSD
Capacity 128GB
Form Factor M.2 2242
Interface SATA III 6 Gb/s
NAND Flash Type 3D NAND
Sequential Read Speed Up to 520 MB/s
Sequential Write Speed Up to 400 MB/s
4K Random Read/Write (IOPS) Read: 50,000 • Write: 75,000
MTBF 2,000,000 hours
TBW (Terabytes Written) 160TB
Operating Voltage DC 3.3V ±5%
Power Consumption 0.82W Idle • 1.05W Read • 1.55W Write
Operating Temperature 0°C to 70°C
Storage Temperature -40°C to 85°C
Weight 5g
Dimensions (L × W × H) 42 × 22 × 3.85 mm
Warranty 5 Years
Key Features Compact M.2 2242 size, 3D NAND, LDPC error correction, TRIM & S.M.A.R.T. support
Ideal For Ultrabooks, Mini PCs, Small Form Factor devices
Quantity

Out of stock

View full details