1
/
of
7
Share
4TB 2.5" SATA III Internal Solid State Drive (SSD) EVM – 550MB/s Read | 500MB/s Write | 3D NAND | Ultra-Large High-Speed Storage
4TB 2.5" SATA III Internal Solid State Drive (SSD) EVM – 550MB/s Read | 500MB/s Write | 3D NAND | Ultra-Large High-Speed Storage
Regular price
Rs. 25,999.00
Regular price
Sale price
Rs. 25,999.00
Shipping calculated at checkout.
| Specification | Details |
|---|---|
| Brand | EVM |
| Model | 2.5" SATA III SSD |
| Capacity | 4TB |
| Form Factor | 2.5-inch |
| Interface | SATA III 6 Gb/s |
| Controller | SMI / MAXIO / YEESTOR |
| NAND Flash Type | 3D NAND |
| Sequential Read Speed | Up to 550 MB/s |
| Sequential Write Speed | Up to 500 MB/s |
| Operating Voltage | DC 5V ±5% |
| Operating Temperature | 0 °C – 70 °C |
| Storage Temperature | −40 °C – 85 °C |
| Shock Resistance | 1500 G / 0.5 ms |
| Vibration Resistance | 10–2000 Hz, 20 G |
| MTBF (Mean Time Between Failures) | 1.5 Million Hours |
| Power Consumption | < 2 W (Active) |
| Dimensions (L × W × H) | 100.2 × 69.8 × 7 mm |
| Warranty | 3 Years |
| Compatibility | Desktop PCs, Laptops, Workstations |
| Ideal For | Gaming, video editing, heavy data storage, and professional workloads |
Quantity
Couldn't load pickup availability
Out of stock
View full details
